The final project push!

The fresh waster system was plumbed in Pex to prevent freeze breakage.  Dipping hose in boiling water makes fitting to a hose barb simple! The septic holding tank was converted to the main bilge.  This 4″ deck plate will serve as emergency access, should we ever need to use an emergency de-watering pump. The hatch […]

Read more "The final project push!"